Pile Caps
If you have any specific requirements please contact us.
All pile caps are constructed by using sides only, scoring outside of intended fold and hinging CBF to form any shape of pile. Spacers are clipped to the reinforcement cage to ensure the pile profile is maintained. Backfill uniformly to within 50mm of top of CBF.
Please see the videos and images below for a description of how to install pile caps.